Low-Voltage Cabling in Lisi — 26 Network Points

SafeTech is carrying out low-voltage cabling work in Lisi, Tskhinvala, Tbilisi, Georgia. At the current stage, cable runs for 26 network points have been installed using a total of 600 meters of network cable marked CAT6e. The work includes organizing the cabling infrastructure with consideration for orderly cable distribution, protection from mechanical damage and access for future maintenance. The project is still in progress, so further work and final results will be updated after the relevant stages are confirmed. SafeTech provides low-voltage cabling, structured cabling and LAN infrastructure services in Tbilisi and other regions of Georgia. Contact: 571 430 169. Website: https://safetech.ge

Network cable used
600 m
Network points
26
Cable marking
CAT6e
Network cable used
600 m
Cable marking
CAT6e
Low-voltage cabling in Lisi, Tskhinvala, Tbilisi — cable runs for 26 network points
Project videoSafeTech

Low-Voltage Cabling in Lisi — 26 Network Points

Low-voltage cabling project in Lisi, Tskhinvala, Tbilisi: 26 network points and 600 meters of network cable marked CAT6e. SafeTech.

Watch video

Project scope

City
Tbilisi
Object type
Site type not specified
Network cable used
600 m
Project status
In Progress
Network cable used
600 m of network cable
Cable marking
CAT6e
Work scope
Low-voltage network cabling

Technical specifications

10Tvt FullColor 4mp camera
`116 Port Poe Switch
1Tvt 16port Nvr
610Cat 6 sftp Cable
CAT6eCable marking
EthernetNetwork technology
In ProgressProject status
600 mNetwork cable used so far
Low-voltage cabling infrastructureWork scope
Structured Cabling NetworkInfrastructure

Share

Project challenge

Organizing Cabling for 26 Network Points

Installing cabling infrastructure for 26 network points requires organized cable routes, orderly line distribution and consideration of access for future maintenance. Protecting cables from mechanical damage and allowing for potential network expansion are also important. These are technical tasks, not confirmed defects.

Cabling for 26 Network Points Using Cable Marked CAT6e

At the current stage of the project, cable runs for 26 network points have been installed. A total of 600 meters of network cable marked CAT6e has been used. The work is continuing, and this volume does not represent the project's final result.

Allowing for Further Cabling Infrastructure Work

The project is in progress. Information about further work and its results will be added after the relevant stages are confirmed. This record reflects only the 26 network points and 600 meters of network cable confirmed at the current stage.

Implemented solution

Cabling Installation for 26 Network Points

At the current stage of the project, SafeTech has installed cable runs for 26 network points using network cable marked CAT6e. A total of 600 meters of network cable has been used. This represents the current stage of the low-voltage infrastructure work.

Network Cable Marked CAT6e

As part of the low-voltage cabling infrastructure, network cable marked CAT6e is being installed in stages. At the current stage, 600 meters of cable has been used.

Organizing Cable Routes

The ongoing work includes organizing cable routes and distributing cables in an orderly manner to maintain access for future maintenance. The project is not yet complete.

Implementation process

  1. Cabling Work Organization

    Organizing the network points and cabling work is important for orderly cable distribution and consideration of access for future maintenance. This stage does not describe specific project drawings or measurements.

  2. Cable Route Organization

    Organizing cable routes is important for orderly cable distribution and consideration of access for future maintenance.

  3. Cabling for 26 Network Points

    Cable runs for 26 network points have been installed. The work used 600 meters of network cable marked CAT6e.

  4. Further Cabling Infrastructure Work

    The project is in progress. Information about further work and its results will be added after the relevant stages are confirmed.

Gallery

3 ფოტო

Project results

≈600 m

Installed Cabling

Approximately 600 meters of low-voltage cabling were installed and organized for the private house systems.

14

Network Points

CAT6 infrastructure was prepared for 14 RJ45 network points.

10

IP Camera Points

Dedicated CAT6 lines were prepared for 10 IP video surveillance camera points, supporting Ethernet and PoE connectivity.

4

Integrated Systems

Networking, IP video surveillance, video intercom and Ajax security infrastructure were integrated into one organized low-voltage architecture.

26

Network Points

At the current stage of the project in Lisi, Tskhinvala, Tbilisi, cable runs for 26 network points have been installed. The project is ongoing.

600 m

Network Cable Used

A total of 600 meters of network cable marked CAT6e has been used at the current stage.

Network Cabling in Lisi, Tbilisi | 26 Points | SafeTech Georgia